ENGINE GENERAL INFORMATION AND DIAGNOSIS (G16/J20 ENGINES) 6-101
DTC CONFIRMATION PROCEDURE
1) Connect scan tool to DLC with ignition switch OFF.
2) Turn ON ignition switch and clear DTC, pending DTC and freeze frame data by using scan tool.
3) Increase vehicle speed to 80 – 90 km/h (50 – 56 mph).
4) Keep above vehicle speed for 5 min. or more (Throttle valve opening is kept constant in this step).
5) Stop vehicle and check if DTC and pending DTC exists by using scan tool. If not, check if catalyst monitoring
test has completed by using scan tool. If not in both of above checks (i.e., no pending DTC and catalyst
monitoring test not completed), check vehicle condition (environmental) and repeat Step 3) through 5).
TROUBLESHOOTING
WARNING:
• When performing a road test, select a place where there is no traffic or possibility of a traffic acci-
dent and be very careful during testing to avoid occurrence of an accident.
• Road test should be carried out with 2 persons, a driver and a tester, on a level road.
NOTE:
Check to make sure that the following conditions are satisfied when using this “DTC Confirmation
Procedure”.
• Intake air temp. : –8°C, 18°F or higher
• Engine coolant temp. : –8 – 110°C (18 – 230°F)
• Altitude (barometric pressure) : 2400 m, 8000 ft or less (560 mmHg, 75 kPa or more)
Step
Action
Yes
No
1
Was “Engine Diag. Flow Table” performed?
Go to Step 2.
Go to “Engine Diag. Flow
Table”.
2
Exhaust System Visual Inspection :
1) Check exhaust system for leaks, damage
and loose connection.
Is it in good condition?
Go to Step 3.
Repair or replace.
3
HO2S-2 Output Voltage Check :
1) Check output voltage of HO2S-2 referring to
Step 2 of “DTC P0136 Diag. Flow Table” in
this section.
Is check result satisfactory?
Replace three way cata-
lytic converter.
Check “RED/GRN” (Can-
vas Top model), “RED/
BLU” (other than Canvas
Top model) and “GRY/
YEL” wires for open and
short, and connections for
poor connection.
If wires and connections
are OK, replace HO2S-2.
Summary of Contents for Engine 2002 GRAND VITARA SQ625
Page 5: ......
Page 248: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 107 Fig for Step 4...
Page 274: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 133 Fig and Table for Step 3...
Page 291: ...6 1 150 ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE...
Page 360: ...ENGINE MECHANICAL G16 ENGINE 6A1 69 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 489: ...6A2 114 ENGINE MECHANICAL H25 ENGINE...
Page 572: ...ENGINE MECHANICAL J20 ENGINE 6A4 83 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 591: ...6A4 102 ENGINE MECHANICAL J20 ENGINE...
Page 598: ...ENGINE COOLING 6B 7...
Page 623: ...6B 32 ENGINE COOLING...
Page 693: ...6E1 62 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Page 697: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE ENGINE AND EMISSION CONTROL SYSTEM DIAGRAM...
Page 743: ...6E2 50 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 814: ...CHARGING SYSTEM 6H 21 Disassembly 70 A and 80 A types...
Page 827: ...6H 34 CHARGING SYSTEM...
Page 833: ...6K 6 EXHAUST SYSTEM...
Page 834: ...Prepared by 1st Ed Dec 2002 Printed in Japan 824...