6A2-56 ENGINE MECHANICAL (H25 ENGINE)
5) Install 1st timing chain.
Refer to “1st Timing Chain and Chain Tensioner” in this sec-
tion for installation.
6) Install LH bank 2nd timing chain.
Refer to “LH (No.1) Bank 2nd Timing Chain and Chain Ten-
sioner” in this section for installation.
7) Install timing chain cover.
Refer to “Timing Chain Cover” in this section for installation.
8) Install oil pan, front differential housing, P/S system, cooling
system, intake manifold with throttle body and other parts.
9) Refill cooling system with coolant, front differential with gear
oil, P/S system with specified fluid and engine with engine
oil.
10) Check wheel alignment referring to “Front End Alignment” in
Section 3A.
11) Verify that there is no fuel leakage, water leakage and oil
leakage at each connection.
Summary of Contents for Engine 2002 GRAND VITARA SQ625
Page 5: ......
Page 248: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 107 Fig for Step 4...
Page 274: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 133 Fig and Table for Step 3...
Page 291: ...6 1 150 ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE...
Page 360: ...ENGINE MECHANICAL G16 ENGINE 6A1 69 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 489: ...6A2 114 ENGINE MECHANICAL H25 ENGINE...
Page 572: ...ENGINE MECHANICAL J20 ENGINE 6A4 83 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 591: ...6A4 102 ENGINE MECHANICAL J20 ENGINE...
Page 598: ...ENGINE COOLING 6B 7...
Page 623: ...6B 32 ENGINE COOLING...
Page 693: ...6E1 62 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Page 697: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE ENGINE AND EMISSION CONTROL SYSTEM DIAGRAM...
Page 743: ...6E2 50 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 814: ...CHARGING SYSTEM 6H 21 Disassembly 70 A and 80 A types...
Page 827: ...6H 34 CHARGING SYSTEM...
Page 833: ...6K 6 EXHAUST SYSTEM...
Page 834: ...Prepared by 1st Ed Dec 2002 Printed in Japan 824...