ENGINE MECHANICAL (J20 ENGINE) 6A4-11
INSTALLATION
Reverse removal procedure for installation noting the followings.
• Use new intake manifold gasket (1).
• Install fuel delivery pipe with fuel injectors to cylinder head
referring to “Fuel Injector” in Section 6E1.
• Adjust accelerator cable play and A/T throttle cable play (for
vehicle with A/T) referring to “Accelerator Cable Adjustment”
and “A/T Throttle Cable Adjustment” in Section 6E1.
• Check to ensure that all removed parts are back in place.
Reinstall any necessary parts which have not been rein-
stalled.
• Refill cooling system referring to “Cooling System Flush and
Refill” in Section 6B.
• Upon completion of installation, turn ignition switch ON but
engine OFF and check for fuel leaks.
• Finally, start engine and check for engine coolant leaks.
Summary of Contents for Engine 2002 GRAND VITARA SQ625
Page 5: ......
Page 248: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 107 Fig for Step 4...
Page 274: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE 6 1 133 Fig and Table for Step 3...
Page 291: ...6 1 150 ENGINE GENERAL INFORMATION AND DIAGNOSIS H25 ENGINE...
Page 360: ...ENGINE MECHANICAL G16 ENGINE 6A1 69 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 489: ...6A2 114 ENGINE MECHANICAL H25 ENGINE...
Page 572: ...ENGINE MECHANICAL J20 ENGINE 6A4 83 Main Bearings Crankshaft and Cylinder Block COMPONENTS...
Page 591: ...6A4 102 ENGINE MECHANICAL J20 ENGINE...
Page 598: ...ENGINE COOLING 6B 7...
Page 623: ...6B 32 ENGINE COOLING...
Page 693: ...6E1 62 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES...
Page 697: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE ENGINE AND EMISSION CONTROL SYSTEM DIAGRAM...
Page 743: ...6E2 50 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 814: ...CHARGING SYSTEM 6H 21 Disassembly 70 A and 80 A types...
Page 827: ...6H 34 CHARGING SYSTEM...
Page 833: ...6K 6 EXHAUST SYSTEM...
Page 834: ...Prepared by 1st Ed Dec 2002 Printed in Japan 824...