![Spectris Particle Measuring Systems IsoAir 310P Operation Manual Download Page 32](http://html.mh-extra.com/html/spectris/particle-measuring-systems-isoair-310p/particle-measuring-systems-isoair-310p_operation-manual_1344042032.webp)
Sensor Installation
Chapter 2 Unpacking and Installation
IsoAir 310P Aerosol Particle Sensor Operations Manual
Page 2-13
Figure 2-10
Connectors Wired to the Terminal Block
Replacing Fuses
Disconnect the power cord from its power source.
>> Required items:
• Replacement fuse: 250 V, 1 A, 5 x 20 mm, T
>> To replace a fuse:
1
Remove the electrical power wiring from the unit or from the facility power
connection.
2
Turn the fuse holder to remove fuse.
3
Replace the blown fuse in the fuse holder with a new fuse as specified above.
4
Reinstall the fuse holder.
5
Reconnect the power wiring or facility power connection and re-apply power.
Connecting Input-Output Cables
Wiring should be installed as needed. For example, if you will not have any analog
inputs, you do not need to install a cable to collect analog signals.
All connectors must be field-wired.
WARNING