Chapter 5 - Recording
Courier User Handbook 5-21
5.8.3. Changing the metering between dB
scale and PPM scale
When in the
Record, Record Pause and Playback Modes
, the metering can be made to
show a scale of either PPM (“peak programme metering” - a method of showing the
peak level, mainly for UK use), or dB (which is an approximation to the VU scale
“volume units” which shows an average signal level).
Note : The ballistics of the meter does not change - it is only the scale that
alters
.
To change the scale from one to the other, in the
Cut-List Mode
Press the MENU button.
The following will be displayed :
Select [Setup] :
then [Audio] :
Select [Meter Type], to show :
Press the ENTER key to choose either [PPM Meter] or [dB Meter] and return to
the previous menu, or select [Close] to exit without making any changes.
Summary of Contents for COURIER
Page 1: ...Portable Hard Disk Recorder User Handbook ...
Page 32: ...Chapter 2 Introduction 2 18 Courier User Handbook This page is deliberately blank ...
Page 48: ...Chapter 4 Menu operation 4 6 Courier User Handbook This page is deliberately blank ...
Page 80: ...Chapter 6 Playing Monitoring 6 6 Courier User Handbook This page is deliberately blank ...
Page 102: ...Chapter 7 Editing 7 22 Courier User Handbook This page is deliberately blank ...
Page 162: ...Chapter 12 connectivity Courier User Handbook 12 20 This page is deliberately blank ...
Page 196: ...Appendix A upgrading the firmware A 4 Courier User Handbook This page is deliberately blank ...