18 – 3
The following is the bill of material and tools required to install the shutter.
Bill of material
(1)
Shutter subassembly (1 unit)
(2)
Socket head cap screws M6x10 with locking coating (8 units)
(3)
Shutter spring assemblies (4 units)
Tools required
(4)
¼ inch slotted-type screwdriver
(5)
5 mm hex socket screwdriver
(6)
Torque wrench with 5 mm hex socket bit
(1)
(2)
(3)
(6)
(5)
(4)
Summary of Contents for UL 1066
Page 56: ...7 5 7 2 Frame size II fused ...
Page 58: ...7 7 ...
Page 63: ...7 12 8 27 210 0 8 27 210 0 8 27 210 0 3 75 95 2 ...
Page 64: ...7 13 ...
Page 65: ...7 14 7 7 Frame size III fuse carriage ...
Page 66: ...7 15 ...
Page 69: ...7 18 7 9 External sensor for neutral conductor WLNCT2 ...
Page 70: ...7 19 WLNCT3 ...
Page 85: ...9 5 I tripping Ground fault tripping ...
Page 231: ...15 12 Pre assembling the locking module Installing 0767 1 2 3 4 6 5 ...
Page 232: ...15 13 1 Socket head cap screw M5 with washer and nut 7 8 Size 4 5 Nm 45 lb in ...
Page 289: ...23 7 23 3 3 Installing arc chutes 1 2 6 5 PH 2 0043 02 3 4 5 6 For frame size III 3 PH 2 ...
Page 298: ...23 16 6 7 8 9 5 2 1 Size 5 mm ...
Page 333: ......