23 – 8
Frame size II and frame size III
1
Insert arc chute, push cover back if necessary
2
Slide the cover into place
3
Check position of the 2 screens, FS III only
4
Hook the cover carefully into place and fold it down, FS III only
5
Insert the screw and tighten to the specified torque
23.3.4
Catalog numbers
Interrupting class
Frame size
Catalog No.
all
II
WLARC2
H, L, F
III
WLARC3
M
III
WLARCM3
0043-02
1
2
3
4
5
PH 2
10 Nm
89 lb-in
Summary of Contents for UL 1066
Page 56: ...7 5 7 2 Frame size II fused ...
Page 58: ...7 7 ...
Page 63: ...7 12 8 27 210 0 8 27 210 0 8 27 210 0 3 75 95 2 ...
Page 64: ...7 13 ...
Page 65: ...7 14 7 7 Frame size III fuse carriage ...
Page 66: ...7 15 ...
Page 69: ...7 18 7 9 External sensor for neutral conductor WLNCT2 ...
Page 70: ...7 19 WLNCT3 ...
Page 85: ...9 5 I tripping Ground fault tripping ...
Page 231: ...15 12 Pre assembling the locking module Installing 0767 1 2 3 4 6 5 ...
Page 232: ...15 13 1 Socket head cap screw M5 with washer and nut 7 8 Size 4 5 Nm 45 lb in ...
Page 289: ...23 7 23 3 3 Installing arc chutes 1 2 6 5 PH 2 0043 02 3 4 5 6 For frame size III 3 PH 2 ...
Page 298: ...23 16 6 7 8 9 5 2 1 Size 5 mm ...
Page 333: ......