9 – 100
Neutral conductor tripping test
The long-time delayed short-circuit tripping function for the neutral conductor and the trip unit circuitry for ETU types 727-776 can be tested
using the test device.The current sensor for the neutral conductor must be attached
and the "Neutral conductor protection" func-
tion must be switched on
1
Charge the circuit breaker
2
Close the circuit breaker
3
Press the [N] button
The circuit breaker will trip after the set long-time delay time, plus approx. 2 seconds processing time, has elapsed. If the test device has
completed a test without faults, the "ETU STATUS" LED will light up continuously green. If a fault is detected, the LED will flash. The type of
flashing indicates what type of fault is present (fault codes are listed on page 9-104).
Ground-fault tripping test
The ground-fault tripping function and the trip unit circuitry of ETU types 745-746 with an installed ground-fault protection module (with trip-
ping function WLGFM48 or WLGFM76) can be tested using the test device. The current sensor for the neutral conductor
and/or
the iron-core ground-fault sensor
must be attached.
1
Charge the circuit breaker
2
Close the circuit breaker
3
Press the [G] button
The circuit breaker will trip after the set ground-fault tripping delay time, plus approx. 2 seconds processing time, has elapsed. If the test
device has completed a test without faults, the "ETU STATUS" LED will light up continuously green. If a fault is detected, the LED will flash.
The type of flashing indicates what type of fault is present (fault codes are listed on page 9-104).
Testing the measured value display
This function works by inputting a signal into the trip unit. The signal is displayed as a single-phase current on the trip unit's display, and the
current's measured value is also transmitted via the communication interface to the connected
Cublicle
BUS
modules and the connected
MODBUS / PROFIBUS-DP networks.
This feature only works with an integrated display (WLETU745 with WLLCD748, WLETU748 with WLLCD748, WLETU776), and communi-
cates test signals when a communication interface and/or a
Cublicle
BUS
module is installed on the trip unit.This feature does not work when
a MeteringPLUS (WLMETERP) module is installed.
1
Connect 24 V DC to power the trip unit.
2
Press the [I] and [N] buttons simultaneously
A single-phase test signal is fed into the trip unit, which simulates a single-phase load current for the ETU. The local display, the connected
communications and connected
Cublicle
BUS
modules output this current value. The test signal will specify the simulated value to the first
phase for 30 seconds, before switching to the next phase. The cycle runs in the order L1, L2, L3, N, G. The test cycle is completed when all
phases have been tested.
Activation the trip unit
To activate the trip unit, press the "N" and "G" buttons simultaneously.
The trip unit will remain activated until another button on the handheld test device (WLTS) is depressed.
With this function, the "T.U.-Error"-LED can be checked if the status test had finished with the error "Trip unit defective".
N
G
I
N
+
N
G
+
Summary of Contents for UL 1066
Page 56: ...7 5 7 2 Frame size II fused ...
Page 58: ...7 7 ...
Page 63: ...7 12 8 27 210 0 8 27 210 0 8 27 210 0 3 75 95 2 ...
Page 64: ...7 13 ...
Page 65: ...7 14 7 7 Frame size III fuse carriage ...
Page 66: ...7 15 ...
Page 69: ...7 18 7 9 External sensor for neutral conductor WLNCT2 ...
Page 70: ...7 19 WLNCT3 ...
Page 85: ...9 5 I tripping Ground fault tripping ...
Page 231: ...15 12 Pre assembling the locking module Installing 0767 1 2 3 4 6 5 ...
Page 232: ...15 13 1 Socket head cap screw M5 with washer and nut 7 8 Size 4 5 Nm 45 lb in ...
Page 289: ...23 7 23 3 3 Installing arc chutes 1 2 6 5 PH 2 0043 02 3 4 5 6 For frame size III 3 PH 2 ...
Page 298: ...23 16 6 7 8 9 5 2 1 Size 5 mm ...
Page 333: ......