Redundancy via SCA-RS
SICAM RTUs, SICAM AK Redundancy
Unrestricted
73
DC2-026-2.07, Edition 10.2016
1.5.2.3.2 Installing 2
nd
Power Supply
The second power supply is installed in the upper left slot.
Therefore the CM-5680 connection p.c.b. and socket connector must be installed before. The
same parts as used for the first power supply have to be used.
Designation
Item-Number/MLFB
CM-5680 supply/signaling PS-562x
BC5-680
6MF10130FG800AA0
Installing Connection P.C.B. CM-5680
•
Open the screws of the plate that covers the slot for the second power supply
•
Install the plates on which connection p.c.b. and socket connector will be mounted
•
Screw the socket connector from inside the mounting rack to the plates
•
Screw the connection p.c.b. from the rear side of the mounting rack to the plates
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
RY
ER
SICAM
PS-5620
PS-5620
ESD
EARTH
FACILITY
2 power supply
nd
1 power supply
st
CM-5680
Plate
Socket connector
Plate
CM-2833 rear side