![Siemens IM 153-4 PN Operating Instructions Manual Download Page 67](http://html.mh-extra.com/html/siemens/im-153-4-pn/im-153-4-pn_operating-instructions-manual_377175067.webp)
Installation
4.2 Installation
ET 200M
Operating Instructions, 12/2008, EWA-4NEB780600602-08
65
Step
Activity
Figure
3.
Hook the modules onto the rail (1),
slide them along as far as the module on the left
(2), and swing them down into place (3).
(7
4.
Bolt the modules tight, applying a torque of
between 0.8 and 1.1 Nm.
(7
Summary of Contents for IM 153-4 PN
Page 186: ...Functions 8 9 SNMP ET 200M 184 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Page 254: ...Order Numbers for the ET 200M ET 200M 252 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Page 268: ...Glossary ET 200M 266 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...