![Siemens IM 153-4 PN Operating Instructions Manual Download Page 66](http://html.mh-extra.com/html/siemens/im-153-4-pn/im-153-4-pn_operating-instructions-manual_377175066.webp)
Installation
4.2 Installation
ET 200M
64
Operating Instructions, 12/2008, EWA-4NEB780600602-08
Sequence when hanging the modules
Hang the modules onto the rail as follows:
1.
Power supply module
2.
IM 153-x
3.
Signal module(s)
Note
If you are installing SM 331 analog input modules, please check before installation
whether you have to move the measuring range submodules on the side of the module.
(Refer to chapter "Analog modules" in the "S7-300 automation system, module
specifications (
http://support.automation.siemens.com/WW/view/en/8859629
)" reference
manual.)
Sequence for Installation
Proceed as follows to install the modules:
Table 4- 3
Installing modules on mounting rails
Step
Activity
Figure
1.
Hook the power supply unit PS 307 onto the rail
and screw it tight.
2.
Clip on the bus connector.
A bus connector is included with each signal
module, but not however with the IM 153-x. When
installing the bus connector always start with the IM
153-x:
•
Take the bus connector from the "last" module
and insert it in the IM 153-x.
•
Do not plug a bus connector into the "last"
module.
Do not insert any bus connectors between the PS
307 and IM 153-x!
(7
Summary of Contents for IM 153-4 PN
Page 186: ...Functions 8 9 SNMP ET 200M 184 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Page 254: ...Order Numbers for the ET 200M ET 200M 252 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Page 268: ...Glossary ET 200M 266 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...