![Siemens IM 153-4 PN Operating Instructions Manual Download Page 42](http://html.mh-extra.com/html/siemens/im-153-4-pn/im-153-4-pn_operating-instructions-manual_377175042.webp)
Assignment planning
3.4 Structure variants and configuration possibilities for PROFINET IO
ET 200M
40
Operating Instructions, 12/2008, EWA-4NEB780600602-08
Redundant operation of the ET 200M on an S7-400H
Note the general rules for the structure of an H system.
You will find the general rules for the structure of an H system in the "S7-400H, – fault-
tolerant systems (
http://support.automation.siemens.com/WW/view/en/1186523
)" system
manual.
3.4
Structure variants and configuration possibilities for PROFINET IO
Structure variants and configuration possibilities for PROFINET IO can be found in the
"PROFINET System Description
http://support.automation.siemens.com/WW/view/en/19292127
)" system manual.
3.5
Configuring the mechanical structure
3.5.1
Horizontal or vertical configuration
Installation Options
You can install the ET 200M horizontally or vertically.
Always arrange the power supply and IM 153-x to the left or below.
①
Power supply, then IM 153-x
Figure 3-5
Horizontal and vertical installation of an ET 200M
Summary of Contents for IM 153-4 PN
Page 186: ...Functions 8 9 SNMP ET 200M 184 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Page 254: ...Order Numbers for the ET 200M ET 200M 252 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...
Page 268: ...Glossary ET 200M 266 Operating Instructions 12 2008 EWA 4NEB780600602 08 ...