Intelli-FLEX II product guide • • • 4 - 1
4
Site planning
Site planning guidelines
Follow these guidelines to create an operating environment that allows the
Intelli-FLEX II system to perform well. Perform regular inspections to ensure that
the fence remains in good condition. Timely repairs to fence damage, the control
of vegetation, and regular visual inspections of all detection zones, will provide
years of effective operation.
Site planning includes four main steps. These steps will be detailed in the
following sections:
For installation guidelines refer to
Chapter 5, Installation instructions
.
survey site
upgrade existing structures
as necessary
layout components on site
plan in accordance with
guidelines
determine equipment
requirements