Figure 14 Fully loaded 42U rack for one Slammer and 15 FC Bricks
Legend
1 Reserved for PDU cable routing
2 Rack unit (RU) locators
Note: The physical Brick names used above are for illustration and indicate the
physical location of the Brick in the rack. The actual names or logical names, as
seen in the Pillar Axiom Storage Services Manager, can be different. The logical
location or numbering of each Brick is determined during the installation and
follows the scheme Brick001, Brick002, Brick003, and so on.
Note: Filler panels should be mounted wherever an airflow path short-circuit
could exist. Filler panels should be mounted on the front rails to fill any spaces
below the Pilot or the lowest Pillar Axiom 600 component in the rack. Single
Phase PDUs are mounted on the rear rails so that there are filler panels in the
front. Three-phase PDUs are mounted on the front rails so that there is no need
for the filler panels or the 2U of space above them.
Chapter 2 Set Up the Rack
About Component Placement
44