6 If you have multiple Bricks, install them all now, even those that require
additional racks.
7 Verify that the digit setting of the Brick is in the proper position. The digit
setting must be set to 0 for all Serial ATA (SATA), solid state drive (SSD),
and Fiber Channel RAID (FCR) Bricks and to 1 for all Fiber Channel
Expansion (FCE) Bricks.
8 Ensure that both the power switches that are on the power distribution units
(PDUs) are in the OFF position.
9 When connecting the color coded Wye power cables, ensure that each
Brick gets a power feed from two separate PDUs.
10 Connect the FC cables as indicated in the wiring diagrams included in the
Pillar Axiom 600 SSF Cabling Reference and power on the Bricks.