● When you place the hook in the middle of unit 32, the bottom of the
rail lines up with the bottom of unit 31.
● A 4 U Slammer rail would fill units 31-34 in the above illustration.
2 At the front of the rack, slide the rail scopes until the rail reaches the holes
at the front.
3 While keeping the rail horizontal, place a spacer on a #20 Torx screw and
screw it through the bottom hole in the front frame and into the rail.
See the next figure.
Repeat this step for the hole above it (but not the top hole, which is for
securing the Slammer).
4 Secure the screws at the back, under the scope hook.
5 Repeat Steps 1 through 4 for the other side rail.
Figure 21 Slammer rails installed in rack
Legend
1 Back
2 Front
3 Slider lock nuts
6 Tighten the four slider lock nuts that attach each rail scope to the rail.
Chapter 2 Set Up the Rack
About Component Placement
56