Table 70 Swapping head-of-string Brick cables (continued)
Legend
1 First Slammer.
2 Second Slammer.
3 Third Slammer.
4 Fourth Slammer.
5 Move the red FC cables when expanding the system to the next larger configuration.
Appendix D Expansion of a Pillar Axiom 600 System Configuration
About Expanding a Pillar Axiom 600 Configuration
216