Customer-Supplied Equipment and Tools
Before starting the installation of a Pillar Axiom 600 system, be sure you have the
needed equipment and tools installed or available.
Table 5 Required tools
Tool
Purpose
Illustration
1/4 inches (7 millimeters)
flat-tip screwdriver
Adjust leveling feet.
Adjustable wrench, 6
inches (15 centimeters)
Adjust leveling feet.
#1 and #2 Phillips-head
screwdrivers
Remove and secure Pillar
Axiom 600 hardware
components.
Socket wrench with a 1/2-
inches (13millimeters)
socket
Connect two racks.
Offset box wrench, 13/32
inches (10 millimeters)
Work with adjustable
mounting rail assemblies.
Torx® T20 screwdriver
Attach rail assemblies to
the vertical channels and
secure hardware
components to the rails.
Torx® T30 screwdriver
Connect two racks.
Wire cutters
Cut tie wraps.
Note: These tools are not included with the Pillar Axiom 600 system.
To install a Pillar Axiom 600 system you need to have the following equipment
and supplies available or installed before you start the installation of the system:
Chapter 1 Before You Begin
Customer-Supplied Equipment and Tools
23