Installer manual Fleck 3150 NXT/NXT2 - Table of Contents
Ref. MKT-IM-010 / C - 18.10.2019
3 / 182
Injector/DLFC/BLFC-Valve configuration...........................................................
Determining the required volume of resin .........................................................
Resin exchange capacity and capacity of the unit ..............................................
Block diagram and configuration example................................................. 43
Multiple valves, parallel interlock system (System #5) .....................................
Multiple valves, parallel series regeneration system (System #6)....................
Duplex alternating immediate system (System #7) ...........................................
Duplex alternating delayed system (System #8) (NXT2 only) ............................
Multiple valves, parallel system with standby unit (System #9) ........................
Multiple valves, system on-demand (System #14).............................................
NXT controller connections for multiple valves .................................................
NXT2 controller connections for multiple valves ...............................................
Programming .................................................................................. 60
Summary of Contents for FLECK 3150 NXT
Page 1: ...FLECK 3150 NXT NXT2 INSTALLER MANUAL WATER PURIFICATION ...
Page 139: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 139 182 DC motor ...
Page 144: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 144 182 Ref MKT IM 010 C 18 10 2019 ...
Page 148: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 148 182 Ref MKT IM 010 C 18 10 2019 ...
Page 182: ...www pentairaquaeurope com ...