Installer manual Fleck 3150 NXT/NXT2 - Programming
Ref. MKT-IM-010 / C - 18.10.2019
79 / 182
6.1.6.5
Hours between last two regenerations
Info
Shows the number of hours between the last two regenerations, which indicates the
duration of the last service cycle.
6.1.6.6
Hours since last regeneration
Info
Shows the number of hours since the last regeneration, indicating the duration of the
current service cycle.
6.1.6.7
Volume remaining
Info
Shows the volume remaining for the valve where controller is installed, excepted for
system #6 where it shows the volume remaining of the complete system.
In system #4, #5, #7, #9
and #14.
In system #6 (complete
system).
6.1.6.8
Valve position
Info
Shows the position of the valve in a multiple valve system, also called the valve
address.
Summary of Contents for FLECK 3150 NXT
Page 1: ...FLECK 3150 NXT NXT2 INSTALLER MANUAL WATER PURIFICATION ...
Page 139: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 139 182 DC motor ...
Page 144: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 144 182 Ref MKT IM 010 C 18 10 2019 ...
Page 148: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 148 182 Ref MKT IM 010 C 18 10 2019 ...
Page 182: ...www pentairaquaeurope com ...