Installer manual Fleck 3150 NXT/NXT2 - Programming
76 / 182
Ref. MKT-IM-010 / C - 18.10.2019
Chemical pump
Activate the relay output during the service based upon the volume of treated water.
Info
Only visible in metered systems.
Info
This parameter has two steps. The first one determines the volume which activates the
relay. The second one determines how long the relay has to be activated once the
volume has passed.
a) Activate the relay with
and
.
b) Default setting: disabled.
c) Press
to validate the selection and advance to the
next parameter.
d) Set the relay activating time with
,
and
.
e) Press
to validate the selection and advance to the
next parameter.
f) Set the relay deactivating time with
,
and
.
g) Press
to validate the selection and advance to the
next parameter.
Disabled.
Relay enabled every
20 liter.
Relay enabled for 1 min.
6.1.5.20
Flow meter selection
Select the size of the flow meter.
Options:
• 1.0" paddle (standard for 2750 valve series);
• 1.0" turbine;
• 1.5" paddle (standard for 2815 and 2850 valve series);
• 1.5" turbine:
• 2.0" paddle (standard for 2900 and 3150 valve series);
• 3.0" paddle (standard for 3900 valve series);
• generic meter.
a) Select the flow meter with
and
.
b) Press
to validate the selection and advance to the
next parameter.
Summary of Contents for FLECK 3150 NXT
Page 1: ...FLECK 3150 NXT NXT2 INSTALLER MANUAL WATER PURIFICATION ...
Page 139: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 139 182 DC motor ...
Page 144: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 144 182 Ref MKT IM 010 C 18 10 2019 ...
Page 148: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 148 182 Ref MKT IM 010 C 18 10 2019 ...
Page 182: ...www pentairaquaeurope com ...