Installer manual Fleck 3150 NXT/NXT2 - Installation
44 / 182
Ref. MKT-IM-010 / C - 18.10.2019
Valve 3150 NXT
Upper distributor
A-2742-FU
Side mounted
adapter 18023
Tank
C-4278-F7
Upper distributor
A-2742-FL
SBV 28182
Air check 18979
Side mounted configuration example
5.7
System types
Info
For all multiple tank systems #5 and #6, NBP version valves must be used.
For all multiple tank systems #7, #8 (for NXT2 only), #9 and #14, WBP version valves
must be used in combination with solenoid valve in the outlet.
The solenoid valve needs to be connected to (P6 (for NXT) and P18 (for NXT2) OUTPUT –
24 VAC 50/60Hz, 0.25 A, MAX )
Info
In this chapter, systems up to four valves are used to describe and illustrate the
different multiple valves systems, even if the described system may control more than
four valves.
Metered immediate:
The controller monitors the volume of water used. As soon as the capacity is
exhausted, the controller starts the regeneration process.
Metered delayed:
The controller monitors the volume of water used. When the remaining capacity is less
than the programmed reserve, the controller queues a regeneration that will start at
the programmed regeneration time.
Time clock:
The controller initiates the regeneration at regular preset time interval at the
programmed regeneration time.
Summary of Contents for FLECK 3150 NXT
Page 1: ...FLECK 3150 NXT NXT2 INSTALLER MANUAL WATER PURIFICATION ...
Page 139: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 139 182 DC motor ...
Page 144: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 144 182 Ref MKT IM 010 C 18 10 2019 ...
Page 148: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 148 182 Ref MKT IM 010 C 18 10 2019 ...
Page 182: ...www pentairaquaeurope com ...