Chapter 3 Description of operation with HL-D3SMI
3-19
3
3-3
Basic Operation Procedure of Sensor
3-3-1
First Measurement
This section describes the basic operating procedures of measurement with HL-D3
series product. In this section, the use of I/O terminal with an external device is
omitted.
STEP1
Installation of HL-D3SMI
In the HL-D3 series, the PC application software
"HL-D3SMI"
is basically used for settings.
Install the
"HL-D3SMI"
in the PC in advance.
“1-5-5 Installation of HL-D3SMI”
STEP2
First power supply
First, connect the controller to the sensor head.
“1-2-1 System Configuration”
Make sure that the +24VDC power supply is connected correctly.
“1-5-1 Connection Method of Power Supply”
Check the wires of the laser control input terminal (or
short-circuit of the short bar).
Connect the controller to the PC with an accompanying USB cable.
Laser emission starts after the system is turned on and starts up
correctly. The laser radiation indicators of the head and the
HEAD indicator of controller light.
“2-1 Functions and Arrangement of I/O Terminal Block”
If the indicator does not light, the sensor head may not be
correctly connected or the laser control input terminal may be
disconnected. Check the connection again.
“1-5-2 Connection Method of Terminal Block”
* Approximately 20 to 30 seconds are required from power-on to
start-up of the sensor.
Start the "HL-D3SMI" with the PC.
Press the
"Online (black letter)"
button on the main screen to
activate the
"Online (red letter)"
status.
"LOAD"
the settings in the sensor once.
Now, the sensor is ready for measurement.
Installation of
HL-D3SMI
Connection check
Power supply
Start of HL-D3SMI
Starting
Summary of Contents for HL-D3 Series
Page 9: ...Preface 7 ...
Page 27: ...Preface 24 MEMO ...
Page 43: ...Chapter 1 Before Use 1 16 1 MEMO ...
Page 219: ...Chapter 4 Description of Functions 4 140 4 MEMO ...
Page 298: ...1 Apx Appendix 1 Index 2 ...
Page 304: ......