Panasonic Electric Works Nordic AB
MEW01351
Rev: -
Planning Instructions Fire alarm system EBL512 G3, V1.1.x
133
20.1.3.5
Alarm delay time (seconds)
Valid for the detectors and zone line inputs with this option selected
via WinG3
120
.
0 is default. 0-255 seconds is possible. Note, this delay time starts
when the fire alarm normally should have been activated.
20.1.4
System properties, Page 2
Latch Faults
(default): All faults have to be acknowledged, also
corrected faults.
Checkbox not marked = No fault latching = Not corrected faults
have to be acknowledged but corrected faults will automatically
be deleted from the fault list.
Global reset of Fan Controls Outputs
: Reset of fan control
system is
global
, i.e. all fan control systems in the EBL512 G3
system will be reset. (Regarding Fan control, see page 31.)
Checkbox not marked = Reset of fan control systems is
local
, i.e.
all fan control systems in the c.i.e. where the switch is located will
be reset.
Use Daylight Saving
:
Australian convention: Forward 1 hour the first Sunday in
October, 02:00
03:00. Backward 1 hour the first Sunday in
April, 03:00
02:00.
New Zealand convention: Forward 1 hour the last Sunday in
September, 02:00
03:00. Backward 1 hour the first Sunday in
April, 03:00
02:00.
All other conventions: According to the current EU regulations,
i.e. forward 1 hour the last Sunday in March, 02:00
03:00.
Backward 1 hour the last Sunday in October, 03:00
02:00.
Checkbox not marked = Daylight saving time is not used.
Silence Switch Disables Alarm Devices
: New Zealand function.
See page 117.
Silence Buzzer With Door Switch
: If the buzzer in the c.i.e.
shall be silenced when the door is opened, this checkbox shall be
marked. This is a violation to the EN54-2 standard.
Flash LED on MCP
: The manual call point (type 3333 / 3339)
built-in LED will flash to indicate communication with the c.i.e.
Checkbox not marked = This option is disabled, i.e. the LED is
switched off until the call point is operated.
Redundant TLON Network
: This checkbox shall be marked
when two TLON Networks shall be used, i.e. each control unit in
the system is equipped with two TLON connection boards (1590).
See also chapter "TLON connection board 1590", page 36.
120
Regarding the Australian and New Zealand conventions the "Alarm
Verification Facility" is valid, see page 101.