![Omron E5AZ User Manual Download Page 108](http://html.mh-extra.com/html/omron/e5az/e5az_user-manual_744338108.webp)
85
Performing Manual Control
Section 4-12
Note
In balanceless-bumpless operation, the MV before switching is used initially
after the switch and then gradually changed to achieve the proper value after
switch to prevent radical changes in the MV after switching operation.
The overall manual operation is illustrated in the following figure.
Related Displays and Parameters
Note
Refer to
4-14 Output Adjustment Functions
for information on the priority for
the MV.
Moving to the Manual
Control Level
• When the
O
key is pressed for at least 3 seconds in the operation level's
auto/manual switching display, the manual mode will be entered and the
manual control level will be displayed. It is not possible to move to any
displays except for the “PV/MV” parameter during manual operation.
Press the
O
key for at least one section from the “PV/MV” display in
manual control level to return to automatic mode and display the top
parameter in the operation level.
0
ON
OFF
MV (%)
Time
Balanceless-bumpless
Manual
Automatic
MV switched
Power in-
terrupted
Parameter name
Symbol
Level
Remarks
PV/MV (manual MV)
---
Manual Control Level
−
5.0 to 105.0 (heating/cooling control:
−
105.0 to
105.0)
Auto/manual switch
a-m
Operation Level
Switches between automatic and manual
modes.
Auto/manual select addi-
tion
amad
Advanced Function Setting
Level
Enables switching between automatic and man-
ual modes.
Summary of Contents for E5AZ
Page 2: ...E5CZ E5CZ U E5AZ E5EZ Digital Temperature Controller User s Manual Produced September 2008 ...
Page 3: ...iv ...
Page 23: ...xxiv ...
Page 53: ...30 Using the Support Software Port Section 2 3 ...
Page 79: ...56 Using HB and HS Alarms Section 3 10 ...
Page 115: ...92 Output Adjustment Functions Section 4 14 ...
Page 173: ...150 Communications Setting Level Section 5 8 ...
Page 205: ...182 Index precautions 22 terminal arrangement 21 terminals 21 ...