![Omron CX-MOTION-NCF - V1.9 Operation Manual Download Page 52](http://html1.mh-extra.com/html/omron/cx-motion-ncf-v1-9/cx-motion-ncf-v1-9_operation-manual_744182052.webp)
28
Creating a New Project
Section 4-1
4-1
Creating a New Project
Creating a New
Project
Use the following procedure to create a new project in the CX-Motion-NCF
Basic Window.
1,2,3...
1.
In the CX-Motion-NCF Basic Window, select
File - New
, press the
Ctrl+N
Keys, or click
in the toolbar.
2.
The PLC Device Type Window will be displayed. Select the PLC Series to
use and click the
OK
Button.
Note
To connect the Position Control Unit to a network, select the PLC Series con-
nected to the personal computer directly. If the PLC with the Position Control
Unit is selected, the communications settings with the PLC and personal com-
puter may not be set correctly.
3.
The PLC will be registered in the project.
When the CX-Motion-NCF is started, a CJ2 CPU Unit will be registered in
the project. If the personal computer is connected to a PLC with a CJ2
CPU Unit, use the project that is already being displayed.
Summary of Contents for CX-MOTION-NCF - V1.9
Page 1: ...Cat No W436 E1 09 CX Motion NCF Ver 1 9 SYSMAC CXONE AL_C V3 CXONE AL_D V3 OPERATION MANUAL...
Page 2: ......
Page 3: ...CXONE AL C V3 CXONE AL D V3 CX Motion NCF Ver 1 9 Operation Manual Revised September 2009...
Page 4: ...iv...
Page 6: ...vi...
Page 20: ...xx...
Page 24: ...xxiv Application Precautions 5...
Page 36: ...12 Connecting to PLC Section 2 2...
Page 40: ...16 Screen Name Section 3 1 Monitor Windows Axis Monitor Window Unit Monitor Window...
Page 66: ...42 Editing Servo Parameters Section 5 2...
Page 71: ...47 Print Section 6 5 Print Samples An example of printed Unit Parameters is shown below...
Page 92: ...68 Writing to Flash Memory Section 7 6...
Page 106: ...82 Axis Monitor Section 8 2...
Page 112: ...88 Test Run Section 9 1...
Page 138: ...114 Troubleshooting Section 11 3...
Page 142: ...118 Index...
Page 146: ...122 Revision History...