![background image](http://html1.mh-extra.com/html/omron/cpm2c-s100c/cpm2c-s100c_operation-manual_742520247.webp)
225
Handling
Section 10-3
Operation Procedure
Start
Yes
No
Mount the EEPROM to the
CPM1-EMU01-V1.
After 2 or 3 s, check if the indicator is
lit green.
See the note
on the right.
Select the memory area to be uploaded.
Press the DM
Button.
Press the UPLOAD But-
ton.
Check if the indicator is blinking green
(indicating that uploading has started).
Yes
No
See the note above.
Check if the indicator is lit green (in-
dicating that uploading has been suc-
cessfully completed).
Yes
No
See the note above.
Remove the Expansion Memory Unit
from the PC.
End
Mount the EEPROM to the CPM1-EMU01-V1
before connecting to the PC.
Check the orientation of the connector
before connecting the CPM1-EMU01-V1.
Note
If the indicator is not lit at all, lit red or
blinks red, uploading will not be pos-
sible. In this case, check the follow-
ing items.
•
Is the connector properly con-
nected?
•
Is the EEPROM properly mounted?
•
Are the EEPROM specifications cor-
rect?
•
Are the peripheral port communica-
tions settings correct?
Upload both the ladder
program and DM 6144 to
DM 6655.
Upload only the ladder
program.
Connect the CPM1-EMU01-V1 to the PC's
communications port (peripheral port).
Summary of Contents for CPM2C-S100C
Page 2: ......
Page 3: ...CPM2C S Programmable Controller Operation Manual Revised September 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 10: ......
Page 14: ...xiv ...
Page 180: ...158 One to one PC Link I O Response Time Section 7 4 ...
Page 222: ...200 Programming Example Section 8 3 ...
Page 250: ......
Page 256: ......
Page 258: ......
Page 260: ...238 Support Software Appendix C ...
Page 268: ......