32
Preparation for Operation
Section 1-6
• Connect the Programming Console, set the mode switch to PRO-
GRAM mode, and turn ON the PC.
• Check the CPU Unit’s LED indicators and the Programming Console’s
display.
• Clear the PC’s memory. (All Clear)
• Make PC Setup settings.
Refer to
and
8-1-4 Preparation for Operation
for details.
5.
Create Ladder Program
• Create a ladder program to control the system.
Refer to
SECTION 8 Using Programming Devices
and the
Programming
Manual
for details.
6.
Write Ladder Program in PC
• Write the ladder program in the PC with the Programming Console or
transfer the program to the PC from the Support Software.
Refer to
SECTION 8 Using Programming Devices
.
7.
Test Run
• Check I/O wiring in PROGRAM mode.
• Check and debug program execution in MONITOR mode.
Refer to
SECTION 9 Test Runs and Error Processing
for details.
Summary of Contents for CPM2C-S100C
Page 2: ......
Page 3: ...CPM2C S Programmable Controller Operation Manual Revised September 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 10: ......
Page 14: ...xiv ...
Page 180: ...158 One to one PC Link I O Response Time Section 7 4 ...
Page 222: ...200 Programming Example Section 8 3 ...
Page 250: ......
Page 256: ......
Page 258: ......
Page 260: ...238 Support Software Appendix C ...
Page 268: ......