
57
Installing the CPM2C-S
Section 3-3
• Separate the CPM2C-S by at least 100 mm from other devices.
3-3
Installing the CPM2C-S
This section describes how to install the CPM2C-S and connect Expansion
Units and Expansion I/O Units. Refer to
Appendix B
for diagrams showing the
dimensions of the CPM2C-S CPU Units.
Note
Refer to the
CPM2C Programmable Controller Operation Manual
for dimen-
sions of the Expansion I/O Units and Expansion Units.
3-3-1
Connecting Units
Up to 3 Expansion I/O Units and Expansion Units can be connected to a
CPM2C-S CPU Unit. Use the following procedure when connecting an
Expansion I/O Unit or Expansion Unit.
1,2,3...
1.
Remove the cover from the CPU Unit’s or the last Expansion I/O Unit’s or
Expansion Unit’s expansion I/O connector. If the cover is difficult to re-
move, use a flat-blade screwdriver to pry the cover from the expansion I/O
connector.
Other
device
Other
device
100 mm min.
100 mm min.
Expansion I/O
connector cover
Summary of Contents for CPM2C-S100C
Page 2: ......
Page 3: ...CPM2C S Programmable Controller Operation Manual Revised September 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 10: ......
Page 14: ...xiv ...
Page 180: ...158 One to one PC Link I O Response Time Section 7 4 ...
Page 222: ...200 Programming Example Section 8 3 ...
Page 250: ......
Page 256: ......
Page 258: ......
Page 260: ...238 Support Software Appendix C ...
Page 268: ......