53
Running a CT Test (Detailed)
Note:
If the "Continuous burden measurement" option is enabled in the
Settings (see section 5.7.3 on page 70), the burden test has to be stopped
manually by pressing the
key.
4. If you enabled the
Primary Winding Resistance
test card in section 4.2,
step 2. on page 50, a message is displayed, asking you to change the wiring
for the primary winding resistance measurement. Connect the primary
winding of the CT as described in chapter 2.
– Make sure that the red LED on the
CT Analyzer
is off.
– Refer to section 2.4.3 on page 27 for detailed information on how to
connect the
CT Analyzer
for the primary resistance measurement.
– You can display the connection diagram by pressing the
key while
the wiring check message is displayed.
Figure 4-5
Primary winding resistance measurement: Wiring check
message (left) and wiring diagram (right)
5. Press the
Start Test
soft key to execute the automatic primary winding
resistance measurement.
Note:
If you do not want to perform the primary winding resistance
measurement, press
Skip Test
to skip the primary winding resistance
measurement and continue with the CT test or
Cancel Test
to abort the
complete test.
6. A message is displayed asking you to change the wiring for the
CT test
.
Connect the CT to the
CT Analyzer
as described in chapter 2.
– Make sure that the red LED on the
CT Analyzer
is off.
– Refer to section 2.4.1 on page 24 for detailed information on how to
connect the
CT Analyzer
for the CT test.
– Be sure that the polarity of all wires is correct.
– You can display the connection diagram by pressing the
key while
the wiring check message is displayed.
Note:
If you do not want to execute the CT test, press the
Skip Test
soft key
instead of changing the wiring. This will skip the CT test and immediately
perform the demagnetization cycle to finish the test.
I/0
?
?
Summary of Contents for CT Analyzer
Page 1: ...CT Analyzer CT SB2 User Manual...
Page 3: ...CT Analyzer User Manual...
Page 4: ...CT Analyzer User Manual 2 Manual Version CTAnalyzerUM AE 3...
Page 39: ...37 Setup and Connection Figure 2 15 Measurement setup for delta compensation Ratio 1 L2 L3 L1...
Page 50: ...CT Analyzer User Manual 48...
Page 60: ...CT Analyzer User Manual 58...
Page 80: ...CT Analyzer User Manual 78...
Page 162: ...CT Analyzer User Manual 160...
Page 172: ...CT Analyzer User Manual 170...
Page 188: ...CT Analyzer User Manual 186...
Page 194: ...CT Analyzer User Manual 192...
Page 195: ...CT SB2 User Manual...
Page 196: ...CT SB2 User Manual 2 Manual Version CTSB2 AE 3...
Page 204: ...CT SB2 User Manual 10...
Page 206: ...CT SB2 User Manual 12...
Page 211: ...17 Hardware 1 x Cable bag Bag for cables and accessories Accessories Description...
Page 212: ...CT SB2 User Manual 18...
Page 226: ...CT SB2 User Manual 32...
Page 242: ...CT SB2 User Manual 48...
Page 248: ...CT SB2 User Manual 54...
Page 250: ...CT SB2 User Manual 56...
Page 252: ...CT SB2 User Manual 58...