CT Analyzer User Manual
138
The following measurement types are available in
Quick Test
.
Meas. type
Usage
Advanced
Provides complete multimeter measurement functionality
and free adjustment of all measurement quantities, such as
AC or DC signal output, voltage or current output, output
frequency, measurement mode (DC, RMS or frequency-
selective) for the input, etc.
For details, please refer to section 8.4 on page 139.
Polarity Check Predefined type, especially intended for polarity checks. The
only adjustable measurement quantity is the output current.
Requires the
CPOL
polarity checker from OMICRON.
For details, please refer to section 8.5 on page 145.
CT Ratio
Predefined type, especially intended for quick measurement
of CT ratios. Adjustable measurement quantities are the
voltage and the frequency of the output signal and the
resistance and inductance of the CT to be measured.
For details, please refer to section 8.6 on page 149.
VT Ratio
Predefined type, especially intended for quick measurement
of VT ratios. Adjustable measurement quantities are the
voltage and the frequency of the output signal.
For details, please refer to section 8.7 on page 151.
Resistance
Predefined type, especially intended for quick measurement
of resistances. The only adjustable measurement quantity is
the value of the output current.
For details, please refer to section 8.8 on page 154.
Impedance
Predefined type, especially intended for quick measurement
of impedances. Adjustable measurement quantities are the
amplitude and the frequency of the current output signal.
For details, please refer to section 8.9 on page 156.
Reactance
Predefined type, especially intended for quick measurement
of reactances. Adjustable measurement quantities are the
voltage and the frequency of the output signal.
For details, please refer to section 8.10 on page 158.
Summary of Contents for CT Analyzer
Page 1: ...CT Analyzer CT SB2 User Manual...
Page 3: ...CT Analyzer User Manual...
Page 4: ...CT Analyzer User Manual 2 Manual Version CTAnalyzerUM AE 3...
Page 39: ...37 Setup and Connection Figure 2 15 Measurement setup for delta compensation Ratio 1 L2 L3 L1...
Page 50: ...CT Analyzer User Manual 48...
Page 60: ...CT Analyzer User Manual 58...
Page 80: ...CT Analyzer User Manual 78...
Page 162: ...CT Analyzer User Manual 160...
Page 172: ...CT Analyzer User Manual 170...
Page 188: ...CT Analyzer User Manual 186...
Page 194: ...CT Analyzer User Manual 192...
Page 195: ...CT SB2 User Manual...
Page 196: ...CT SB2 User Manual 2 Manual Version CTSB2 AE 3...
Page 204: ...CT SB2 User Manual 10...
Page 206: ...CT SB2 User Manual 12...
Page 211: ...17 Hardware 1 x Cable bag Bag for cables and accessories Accessories Description...
Page 212: ...CT SB2 User Manual 18...
Page 226: ...CT SB2 User Manual 32...
Page 242: ...CT SB2 User Manual 48...
Page 248: ...CT SB2 User Manual 54...
Page 250: ...CT SB2 User Manual 56...
Page 252: ...CT SB2 User Manual 58...