3 Operation Theory
PCS-9611 Feeder Relay
3-10
Date: 2014-04-08
Where:
[50/51P.Upp_VCE] is the voltage setting of the undervoltage control element;
[50/51P.U2_VCE] is the voltage setting of the negative sequence voltage control element;
[VTS.En] is the logic setting of the protection voltage transformer supervision function;
[50/51P1.En_VCE] is the logic setting of the voltage control element for the OC1 protection;
[50/51P.En_VTS_Blk] is the logic setting of the function which can block all the OC protective
elements that relate to the voltage measurement when the voltage transformer is failed;
[VTS.Alm] is the alarm signal of the protection voltage transformer supervision;
[BI_En_VT] is the binary input for denoting the local VT is in service;
[BI_VCE_CrossCtrl] is the binary input for inputting the external voltage control signal;
[50/51P.En_VCE_CrossCtrl] is the logic setting of the external voltage control function.
The logic diagram of the local voltage control signal is shown as below. This device can output the
signal
“Sig_VCE” through the binary output (preconfigured through the PCS-Explorer).
Prot.OnLoad
&
[VTS.Alm]
Uca < [50/51P.Upp_VCE]
Ubc < [50/51P.Upp_VCE]
Uab < [50/51P.Upp_VCE]
[
BI_En_VT
]
U2 > [50/51P.U2_VCE]
Sig_VCE
&
50ms
50ms
Figure 3.3-6 Logic diagram of the OC1 phase A voltage control element
Where:
[50/51P.Upp_VCE] is the voltage setting of the undervoltage control element;
[50/51P.U2_VCE] is the voltage setting of the negative sequence voltage control element;
[BI_En_VT] is the binary input for denoting the local VT is in service;
[VTS.Alm] is the alarm signal of the protection voltage transformer supervision;
“Prot.OnLoad” denotes anyone of the three phase currents is greater than 0.04In.
3.3.4 Directional Element for Overcurrent Protection
The phase fault elements of this relay are internally polarized by the quadrature phase -to-phase
voltages, as shown in the table below:
Phase of Protection
Operate Current
Polarizing Voltage
A Phase
Ia
Ubc
B Phase
Ib
Uca
C Phase
Ic
Uab
Summary of Contents for PCS-9611
Page 1: ...PCS 9611 Feeder Relay Instruction Manual NR Electric Co Ltd...
Page 2: ......
Page 10: ...1 Introduction PCS 9611 Feeder Relay 1 b Date 2014 04 08...
Page 30: ...2 Technical Data PCS 9611 Feeder Relay 2 14 Date 2014 04 08...
Page 36: ...3 Operation Theory PCS 9611 Feeder Relay 3 f Date 2014 04 08...
Page 108: ...4 Supervision PCS 9611 Feeder Relay 4 b Date 2014 04 08...
Page 116: ...5 Management Function PCS 9611 Feeder Relay 5 b Date 2014 04 08...
Page 120: ...5 Management Function PCS 9611 Feeder Relay 5 4 Date 2014 04 08...
Page 218: ...9 Configurable Function PCS 9611 Feeder Relay 9 b Date 2014 04 08...
Page 232: ...9 Configurable Function PCS 9611 Feeder Relay 9 14 Date 2014 04 08...
Page 262: ...11 Installation PCS 9611 Feeder Relay 11 b Date 2014 04 08...
Page 272: ...12 Commissioning PCS 9611 Feeder Relay 12 b Date 2014 04 08...
Page 292: ...13 Maintenance PCS 9611 Feeder Relay 13 b Date 2014 04 08...
Page 296: ...14 Decommissioning and Disposal PCS 9611 Feeder Relay 14 b Date 2014 04 08...
Page 298: ...14 Decommissioning and Disposal PCS 9611 Feeder Relay 14 2 Date 2014 04 08...
Page 300: ...15 Manual Version History PCS 9611 Feeder Relay 15 2 Date 2014 04 08...