
18 Contents
241-1501-240 5.2S2
Task flow of NEBS 2000 frame enclosure
installation 134
An extended side panel in relation to extension
hardware 137
Task flow of a side panel installation onto a NEBS 2000
frame 138
Task flow of an FP addition 141
Task flow of an FP decommissioning 143
Task flow of an electrical FP upgrade 147
Task flow of an optical FP upgrade 148
Task flow of a replacement of a failed FP 151
Task flow of a replacement of an FP with one of a
different type 154
Task flow of an installation of a second switch in a NEBS
2000 frame 158
Task flow of NEBS 2000 frame installation 163
Task flow of parts installation in a Passport 15000 in a
NEBS 2000 frame 166
Task flow of parts installation in a Passport 20000 in a
NEBS 2000 frame 169
Task flow of a Passport 15000-VSS installation 172
Task flow of a Passport 15000 or 20000 switch
installation into a 23-inch EIA rack 175
Task flow of a MAC address module replacement 181
Task flow of a modem installation 185
Task flow of a multiport aggregate device
installation 187
Task flow of a multiport aggregate device
replacement 189
Task flow of a Shasta 5000 installation 191
Task flow of a BIM replacement 195
Task flow of a BIP power-and-ground cable
installation 199
Task flow of a BIP power input cable replacement 202
Task flow of a BIP replacement 205
Task flow of a power-and-ground cable assembly
replacement 208
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......