Chapter 17 Hardware procedures 537
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
•
the 3-prong wire connectors point to the right side
•
the mounting ears are above the flat span of the bracket
3
Locate the nearest mounting holes on the uprights of the NEBS 2000
frame as shown in the figure “Location of the temperature sensor bracket
assembly on a NEBS 2000 frame or a rack” (page 540) or on the adapter
brackets that are already fastened to a 23-in. wide EIA rack as shown in
the figure “Location of the temperature sensor bracket assembly on a
23-inch wide EIA rack” (page 541).
4
Insert the bracket assembly between the frame uprights or the rack
adapter brackets, below the BIP, and above the shelf until the mounting
ears touch the uprights or the adapter brackets.
5
Align the mounting-ear screw holes (shown in the figures) with the lowest
holes on the brackets.
6
Loosely fasten a threading-forming 10-mm (3/8-in.) hex-head screw from
pack P0601478 through the 2 mounting-ear holes.
7
Center the sensor bracket and tighten both screws to snug plus a 1/4 turn.
8
At the end of the cable assembly with the 3 connectors occurring at
different lengths, connect the longest one to the left sensor, the middle
one to the middle sensor, and the shortest the right. Ensure that you plug
in each connector, with gentle, even, steady, straight force.
9
Route the rest of the cable assembly to the right side of the rack and down
to the rear of the cooling unit. Leave it hanging loosely for now.
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......