Chapter 17 Hardware procedures 509
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Installing a shelf filler panel
Install a shelf filler panel to cover an opening in the upper half of the front or
rear of a NEBS 2000 frame.
Prerequisites
•
You must be familiar with “Safety considerations and best practices”
(page 53).
•
You need one or both of these parts:
— front filler panel with PEC NTHR76 (1 m or 3.3 ft)
— rear filler panel with PEC NTHR77 (800 mm or 2.6 ft)
•
When a sparing panel or fanout panel is to be or is already mounted onto
the upper half of a NEBS 2000 frame, the termination panel must be
mounted between the frame and the filler panel. The termination panel
and the filler panel can share the same mounting screws, but you will
need at least one helper to hold the parts until they are fastened.
•
You may need a helper to hold a panel until the first 2 mounting screws
are fastened.
Procedure steps
1
Open the kit and unpack the filler panel and thread-forming screws.
2
Count 4 dimples or holes or both in the grounding strip on the outside face
of the right front frame upright starting below the top cable management
bracket. The dimples cover holes in the uprights. Count downwards and
mark the hole (or poke through the dimple). Mark its mate on the opposite
upright.
3
Hold the panel against the front (or rear) face of the frame uprights as in
the figure“Location of the front shelf filler panel” (page 511) so that
•
the edge labeled TOP is pointing upwards
•
the hollow space between the sides faces inwards to the front of the
frame
•
the top two holes in the sides of the panel align with the 2 holes
marked on the frame uprights
•
the cut-ins at the sides of the panel surround the cable management
brackets, that is, the panel does not overlap any bracket
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......