
Contents 11
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Chapter 14
Power-and-ground hardware of a Passport 15000 or
BIP power-and-ground cable installation 197
BIP power input cable replacement 201
Power-and-ground cable assembly replacement 207
Powerup of a Passport 15000 or 20000 210
Shelf assembly replacement 218
Chapter 16
Sparing and fanout panels
Anchoring the NEBS 2000 frame 230
Additional information for installing the frame anchors 235
Assembling a BIP external alarm cable 237
Assembling sparing panel NTQS31 249
Cabling the second cooling unit 255
Checking the backplane pins 258
Checking power input cables to the BIP 261
Checking power output from a system of ac rectifiers 266
Checking power output connections from the BIP 273
Checking the connectivity between FPs and sparing panels 275
Checking the final status of all LEDs 277
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......