
Chapter 16 Sparing and fanout panels 227
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Fanout panel replacement
Replace a fanout panel, if it fails, to restore the connections of the DS3 or E3
FPs to customer premises equipment.
•
“Prerequisites to fanout panel replacement” (page 227)
•
“Fanout panel replacement task flow” (page 227)
Prerequisites to fanout panel replacement
•
Ensure you have access to 241-5701-600 Passport 7400, 15000, 20000
Configuration Guide for procedures in this task that are not located in this
NTP.
•
You will need a fanout panel with PEC NTHW52.
•
When replacing a fanout panel, all traffic passing through it is dropped.
•
If the fanout panel is mounted in a NEBS 2000 frame that has a door
mounted on its front, you need the key for the door lock from kit
NTQS37.
Fanout panel replacement task flow
This task flow shows the sequence of procedures you do to replace a fanout
panel. To link to any procedure, go to “Task flow navigation” (page 228).
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......