
About this document 37
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
— “Installing a BIM” (page 374)
•
added the procedure “Installing a top frame bracket onto a NEBS 2000
frame” (page 568) to the task flow “BIP power-and-ground cable
installation” (page 197)
•
added “Testing the power to the BIP” (page 860) to the task flow “BIP
power input cable replacement” (page 201)
•
updated the figure “Task flow of NEBS 2000 frame installation”
(page 163) to distinguish removing a kickplate from levelling the frame
•
updated these task flows to include handling the hardware for higher
cable densities:
— “Installation of a second switch into a NEBS 2000 frame”
— “NEBS 2000 frame installation” (page 161)
— “Passport 15000 or 20000 switch installation into an EIA rack”
•
updated these task flows to include the handling of front, rear, and side
panels on a NEBS 2000 frame:
— “Installation of a second switch into a NEBS 2000 frame”
— “Parts installation in a Passport 15000 in a NEBS 2000 frame”
— “Parts installation in a Passport 20000 in a NEBS 2000 frame”
— “Passport 15000 or 20000 switch installation into an EIA rack”
— “BIP power-and-ground cable installation” (page 197)
— “BIP power input cable replacement” (page 201)
•
corrected the figure “Task flow of a shelf assembly replacement”
(page 220) to change the name of the temperature assembly procedures
and remove irrelevant procedures
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......