
Chapter 11 Initial switch hardware installations 167
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Task flow navigation
The following references are listed alphabetically:
•
“BIP power-and-ground cable installation” (page 197)
•
•
“Connecting a CP local operator terminal cable” (page 299)
•
“Connecting an FP cable” (page 320)
•
“Door installation onto a NEBS 2000 frame” (page 117)
•
“Installing a BITS cable” (page 388)
•
“Installing a blank processor card” (page 393)
•
•
“Installing a fabric card into a Passport 15000” (page 434)
•
“Installing a fanout panel” (page 463)
•
“Installing a shelf filler panel” (page 509)
•
“Installing a side frame panel, regular size” (page 523)
•
“Installing a sparing panel” (page 532)
•
•
“Installing front or rear frame panels” (page 612)
•
“Peripheral equipment” (page 183)
•
“Powerup of a Passport 15000 or 20000” (page 210)
•
“Removing a side frame panel, regular or extended sizes” (page 724)
•
“Removing front or rear frame panels” (page 774)
•
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......