86 Chapter 5 CP and FP cables
241-1501-240 5.2S2
Cable routing
Route cables between equipment to prepare for connecting the cables.
•
“Prerequisites to cable routing” (page 86)
•
“Cable routing task flow” (page 86)
Prerequisites to cable routing
•
See 241-1501-205 Passport 15000, 20000 Site Requirements and
Preparation Guide to determine whether you need low-density, high-
density, or very high-density cable management hardware. Be familiar
with the functional differences between the extended cable management
brackets, the standard plastic (or metal) brackets, and the paired plastic
brackets.
•
When the extended cable management brackets are needed to
accommodate very high-density coax cables, you must have ensured that
the footprint of the NEBS 2000 frame has 8.0 cm (3.25 in.) for the
required additional space, or that the brackets were already installed
according to the task flow “NEBS 2000 frame installation” (page 161).
You should already have addressed the location and spacing of the
footprint as part of your site planning as described in 241-1501-205
Passport 15000, 20000 Site Requirements and Preparation Guide.
•
You can install both the high-density cable management paired brackets
and the extended cable management brackets on either side of the frame
or on the same side.
Cable routing task flow
This task flow shows the sequence of procedures you do to route high- or low-
density cables. To link to any procedure, go to “Task flow navigation”
(page 88).
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......