
Chapter 9 NEBS 2000 frame accessories 133
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Task flow of an illuminated brandline cover installation
The following task flow shows the sequence of procedures you do to install
an illuminated brandline cover onto the front or rear of a NEBS 2000 frame.
The page reference of each procedure is listed immediately after the task flow.
Figure 28
Task flow of an illuminated brandline cover installation onto a NEBS 2000 frame
Task flow navigation
The following references are listed alphabetically:
•
“Installing an illuminated brandline cover” (page 578)
•
“Installing a top frame bracket onto a NEBS 2000 frame” (page 568)
•
“Removing a brandline cover from a top frame bracket” (page 663)
No
Yes
Yes
No
Illuminated
brandline
cover
installation
End
Installing an
illuminated
brandline cover
Is the top frame
bracket P0876758
already installed?
Is a brandline cover
already installed onto
the frame bracket?
Removing a
brandline cover
from a top frame
bracket
Installing a top
frame bracket
onto a NEBS 2000
frame
For procedure page
numbers, see
Task flow navigation
below
PP_TASK_1108
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......