
46
About this document
241-1501-240 5.2S2
•
Task flow charts were added to improve navigation through tasks and
procedures, to set tasks and procedures in context, and to provide a visual
representation of prerequisites and configuration paths.
•
Procedures were restructured into a modular format.
•
Purpose statements were added to tasks and procedures to provide
context.
•
Prerequisites were divided into those applicable to an entire task. those
applicable only to a specific procedure, and those applicable only to a
specific procedure step. Prerequisites applicable to an entire task were
placed in the appropriate task-level prerequisite section, prerequisites
applicable only to a specific procedure were placed in the perquisites
section of the procedure, and prerequisites applicable only to a specific
step were placed in the step.
•
A ‘Procedure Job Aid’ section was added to procedures where
appropriate. This consists of information that supports the procedure,
such as a component hierarchy figure, a checklist, or a diagram.
•
Conceptual and reference information were removed from procedures,
placed in the appropriate conceptual or reference section, and cross-
referenced from the procedure where appropriate. If no appropriate
conceptual or reference section existed in which to place such
information removed from the procedures, the information was placed in
temporary sections called ‘Supporting information’ and ‘Additional
information’ at the end of the affected chapter. Only supporting
information is cross-referenced from the procedure. The supporting and
additional information sections will be removed when an appropriate
location for the information is created.
Related documents
See the following documents for related information:
•
241-1501-200 Passport 15000, 20000 Hardware Description, which
indicates the integrated purpose and operational behavior of switch
hardware and all supported interworking hardware
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......