
Chapter 17 Hardware procedures 597
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Installing cable management brackets
Install cable management brackets onto the adapter brackets of a 23-inch
wide rack to enable cable management.
Prerequisites
•
You must be familiar with “Safety considerations and best practices”
(page 53).
•
The cable management brackets to mount a shelf onto a 23-inch wide
rack are included in switch hardware packages NTQS04 for a
Passport 15000 or NTQH04 for a Passport 20000. To install cable
management brackets, you need these parts:
— 2 metal cable management brackets (part number P0879577)
— 28 plastic brackets (part number P0937935)
Procedure steps
1
While facing the rear of the rack, locate the left and right short adapter
brackets that have the strain-relief bar and the temperature sensors
fastened to them. These are the only short brackets that will not have
cable management brackets fastened to them.
2
Loosely fasten a cable management bracket to each remaining short
adapter bracket on the rear uprights. Use the thread-forming 10-mm
(3/8-in.) hex-head screws from pack P0601478 through each mounting-
ear hole. Notice the orientation of the cable management brackets in the
figure “Mounted cable management brackets onto rear adapter brackets”
(page 598). The top 8 cable management brackets (4 per side) are metal,
while the bottom 2 or 4 (1 or 2 per side) are plastic.
3
Tighten all rear cable management bracket screws to snug plus a 1/4 turn.
4
While facing the front of the rack, loosely fasten a plastic cable
management bracket in the positions shown by the figure “Mounted cable
management brackets onto rear adapter brackets” (page 598).
5
Tighten all front cable management bracket screws to snug plus a 1/4
turn.
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......