Installing a Shasta 5000 cable management assembly
Install a Shasta 5000 cable management assembly to enable organizing its
processor card interfacing cables when the switch hardware is installed in a
NEBS 2000 frame.
Prerequisites
•
You must be familiar with “Safety considerations and best practices”
(page 53).
•
You will need a cable management assembly with PEC NTHR94, from
the hardware kit NTHW85.
•
To identify the cable management assembly, see the figure “Location of
the cable management assembly for a Shasta 5000 in a NEBS 2000
frame” (page 498).
Procedure steps
1
Unpack the cable management assembly.
2
Position the assembly between the adapter brackets and above the
Shasta 5000 shelf so that
•
the cable channels face you and are at the bottom of the assembly
•
each mounting-ear hole is flush against the uprights
•
the bottom edge of each mounting ear on the assembly rests against
the top edge of each mounting ear on the shelf
•
each bottom mounting-ear hole aligns with the next available screw
hole above the shelf on the adapter bracket
3
While holding the cable management assembly in position, loosely fasten
a thread-forming 10-mm (3/8-in.) hex-head screw through one mounting
ear hole, then a second screw through a hole in the other mounting ear.
4
Loosely fasten the remaining 2 screws.
5
Tighten all screws to snug plus a 1/4-turn.
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......