40
About this document
241-1501-240 5.2S2
•
•
added the procedure “Installing high-density cable management
brackets” (page 619)
•
in the procedure “Removing front or rear frame panels” (page 774),
replaced the figure “Location of front, rear, and side panels, exploded
view” with “Locations of front and rear frame panels, exploded view”
(page 775)
•
added the procedure “Removing a shelf filler panel” (page 721)
•
added the procedure “Removing a side frame panel, regular or extended
sizes” (page 724) in context of accessing cables on the side of a NEBS
2000 frame, or to replace a damaged one, and added the figure “Side
panels, exploded view” (page 726)
•
added dust boots to the procedure “Removing an FP” (page 750) and
added the figure “Fully opened card latches” (page 754)
•
deleted the step to power down a cooling unit in the procedure
“Replacing a cooling unit alarm cable” (page 787)
•
updated the Prerequisites of the procedure “Routing FP cables”
(page 827) to clarify the cable management criteria for the direction of
electrical and optical cables
•
revised the procedure “Routing FP cables” (page 827) to accommodate
— fiber optical Y-splitter cables
— labels
— all cables of an FP
— all FPs in a shelf
•
added clones of figures to most procedures that had cross-references to
figures in other procedures
•
in the procedure “Testing the power to the BIP” (page 860), made
corrections to resistance values, corrected ohmmeter to voltmeter for
when the user is asked to measure potential difference, and asked the user
to turn the power off before beginning the procedure
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......