36
About this document
241-1501-240 5.2S2
•
added to the Prerequisites of these tasks a cross-reference to
understanding the use of a compatible or an equivalent FP:
— “Replacement of a failed FP” (page 150)
— “Replacement of an FP with one of a different card type” (page 153)
•
added the Prerequisite about the BIP to the task flow “Installation of a
second switch into a NEBS 2000 frame” (page 156)
•
added the PEC of a frame to the task flow “NEBS 2000 frame
installation” (page 161)
•
added CP cabling procedures that were missing from these task flows:
— “Installation of a second switch into a NEBS 2000 frame”
— “Parts installation in a Passport 15000 in a NEBS 2000 frame”
— “Parts installation in a Passport 20000 in a NEBS 2000 frame”
— “Passport 15000 or 20000 switch installation into an EIA rack”
•
added the procedure “Removing a shelf filler panel” (page 721) to the
task flow “Installation of a second switch into a NEBS 2000 frame”
(page 156)
•
added the missing CP cable procedures to the task flow “Installation of a
second switch into a NEBS 2000 frame” (page 156)
•
•
updated the Prerequisites to the task flow “MAC address module
replacement” (page 179), including adding the alarm number that
indicates it has failed
•
changed the requirements for matching BIMs to a BIP version in:
— “Prerequisites to installation of a second switch into a NEBS 2000
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......