
172 Chapter 11 Initial switch hardware installations
241-1501-240 5.2S2
Figure 42
Task flow of a Passport 15000-VSS installation
Task flow navigation
The following references are listed alphabetically:
•
“16-slot Passport switch installation”. See 241-7401-240 Passport 7400
Hardware Installation, Maintenance and Upgrade.
•
“BIP power-and-ground cable installation” (page 197)
•
“Grounding a Passport 15000-VSS” (page 362)
•
“Parts installation in a Passport 15000 in a NEBS 2000 frame”
(page 165)
Pasport 15000-
VSS installation
End
16-slot Passport
switch installation
Grounding a Passport
15000 VSS
Parts installation of a Passport
15000 in a NEBS 2000 frame
BIP power-and-ground
cable installation
For procedure page
numbers, see
Task flow navigation
below
PP_TASK_1084
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......