Chapter 14 Power-and-ground hardware of a Passport 15000 or 20000 195
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
BIM replacement task flow
This task flow shows the sequence of procedures you do to replace a BIM. To
link any procedure, go to “Task flow navigation” (page 195).
Figure 49
Task flow of a BIM replacement
Task flow navigation
The following references are listed alphabetically:
•
Table 1
Combinations of BIMs in a BIP
Shelf type
PEC of a BIP
with 2 BIMs
PEC of the BIM pairs that can be added
Passport 20000
AP6C68
two or four AP6C67PA
or
two AP6C67PA and two NT6C60PA
Passport 15000
NT6C62
two or four NT6C60PA
or
two NT6C60PA and two AP6C67PA
BIM
replacement
Powering down a
BIM
End
Removing a BIM
Installing a BIM
For procedure page
numbers, see
Task flow navigation
below
PP_TASK_1075.ins
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......