
Chapter 11 Initial switch hardware installations 169
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Figure 41
Task flow of parts installation in a Passport 20000 in a NEBS 2000 frame
BIP power-and-ground
cable installation
Peripheral
equipment
Powerup of a
Passport 15000 or
20000
Seating cards from the
transportation position
Seating fabrics from the
transportation position
Installing a fanout
panel
(if necessary)
Parts installation in a
Passport 20000 in a
NEBS 2000 frame
Installing a BITS cable
Installing a
sparing panel
(if necessary)
Connecting a CP
local operator
terminal cable
Connecting an FP
cable
Cable routing
Removing front or
rear frame panels
(if present)
Removing a side frame
panel, regular or extended
(if present)
Installing a shelf filler
panel (optional)
End
Side frame panel
installation
(if required)
Door
installation
(if required)
Installing front or
rear frame panels
(if required)
For procedure page
numbers, see
Task flow navigation
below
PP_TASK_1092
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......