© 2021 Nordson Corporation
8-10
Lift Cylinder Installation
1. Remove the lift cylinder packaging and inspect it for damage.
2. See Figure 8-8. Thread the locknut on the new cylinder rod, then thread the clevis all
the way onto the new cylinder rod and lock it in place with the locknut.
3. Unsnap the clevis pin clip from the clevis and remove the pin.
4. Install the cylinder through the square opening in the roof of the feed center, then
carefully guide onto the flange.
5. Reinstall with the matching letters aligned. Secure the cylinder with the four
M8x30 screws.
6. Connect air tubing to the cylinder:
•
6-mm tubing from Down regulator to upper flow control valve.
•
6-mm tubing from Up regulator to lower flow control valve.
• 6-mm tubing from solenoid #3 SOL326 to the cylinder lock.
7. Rotate the E-Stop button on the feed center control panel clockwise to release it and
turn on feed center power and air.
8. Lower the cylinder clevis down the the lance carriage, which should be resting on the
stop bolt at the bottom of the V-track rail.
9. Connect the clevis to the lance carriage with the clevis pin. Snap the pin clip around
the clevis.
10. Install the proximity switches on the cylinder at the same positions as on the old
cylinder:
• LS306: Hopper position
• LS307: Box position
• LS308: Purge position
11. Adjust the position of the purge proximity sensor (LS308).
a. Slide the switch up or down until it senses the magnet in the cylinder piston and the
LED lights.
b. Note the position where the LED turned on, then continue sliding it in the same
direction until the LED turns off.
c.
Slide the switch back up and position it in the midpoint between the off positions
and secure it in place.
NOTE:
Refer to
Lift Cylinder Proximity Switch Adjustment
in the
Installation
section
of this manual to set the positions of the Box switch (LS307) and the Hopper switch
(LS306).
12.
Raise and lower the lance assembly and adjust the cylinder flow control valves for 6
seconds full travel in each direction.
Summary of Contents for Encore XL Powder
Page 8: ...2021 Nordson Corporation 1607027 01 ii Change Record...
Page 12: ...2021 Nordson Corporation 1607027 01 1 4 Safety...
Page 51: ...2021 Nordson Corporation 1607027 01 4 9 Setup 6 5 Figure 4 5 Pneumatic Controls 2 of 2...
Page 60: ...2021 Nordson Corporation 1607027 01 5 8 Operation...
Page 136: ...2021 Nordson Corporation 1607027 01 9 34 Parts...
Page 146: ...2021 Nordson Corporation 1607027 01 10 10Options...
Page 148: ...2021 Nordson Corporation 1607027 01 11 2 Pneumatic and Electrical Diagrams...
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ...ON OFF...
Page 154: ......